top of page

3 New Build Homes, Surrey

JAMCO delivered the full groundworks package for three new build homes in Surrey on behalf of a residential developer. Challenging ground conditions required CFA piling, with careful planning and coordination throughout the early phases of the project. Our scope began with the organisation and management of demolition works, followed by site clearance and bulk earthworks to achieve required levels. Crushed demolition materials were processed and reused on site to form stable hardstanding areas, improving efficiency and reducing waste. We installed tree protection fencing in line with site requirements, along with temporary services including power, water, and internet, and set up full site welfare facilities to support ongoing works. Groundworks included excavation and installation of piling mats to specification, along with all necessary attendances during the piling phase. We returned post-piling to complete under-slab services, drainage, and service coordination across the site. This included foul and surface water drainage systems, incoming utilities such as power, water, and fibre, as well as nil-loss pipework installations to air source heat pump units. Additional works included scaffold mat installation, retaining structures where required, and full external works including driveways, edgings, and final topsoiling to achieve finished levels across the development. The project was delivered in a structured and efficient manner, ensuring each stage was properly prepared for the next and maintaining progress across a complex, multi-plot site.
Project type
Developer New Build
Date
Jan 24
Location
Surrey
bottom of page