JAMCO delivered the groundworks package for a two-unit residential development in Surrey, taking the project from initial site clearance through to a clean handover for follow-on trades.
Works began with the organisation and management of demolition, followed by full site setup including access, welfare, and temporary services. We then carried out all excavation and foundation works, installing footings to specification and preparing the site for substructure construction.
The substructure package included block and beam floor installation, ensuring accurate levels and a solid base ready for the superstructure phase. Alongside this, we installed all required drainage and underground services, carefully coordinated to avoid clashes and ensure a smooth transition into the next stage of the build.
Upon completion of the main works, JAMCO returned for final site dismantling, reducing and removing temporary setups, and carrying out final levelling and dressing of the site. This ensured the development was handed over clean, organised, and ready for the landscaping contractor to take over.
Project type
Developer
Date
Aug 2017
Location
Surrey

01
2 New Build Homes, Surrey

01
DJI_0019.jpg

02
DJI_0028.jpg

03
DJI_0030.jpg

04
DJI_0027.jpg
bottom of page